RENEWABLES / GREEN ENERGY

Our Experience

Having worked across the globe we have an in-depth understanding across a broad spectrum of project types and our experience includes working with clients on the following:

  • Onshore wind farm projects
  • Off-shore wind farms
  • Offshore HVDC converter stations
  • Offshore AC stations
  • Sub-sea cabling projects
  • Solar projects

Case Studies

50MW Onshore Windfarm – Europe 

Appointed delay and quantum experts in a matter relating to an onshore windfarm project. The project scope consisted of wind turbine generators (WTG’s), array cabling, substation and connector cabling. Kenzie analysed the submitted Delay in Start Up (DSU) claim and independently calculated the period of interruption caused by the indemnified event. We further calculated the additional costs and loss of revenue, incurred as a consequence. The matter settled following mediation.

70MW Onshore Windfarm – Europe

Appointed quantum expert in a matter relating an onshore windfarm project. Kenzie analysed the submitted business interruption claim and independently calculated the loss of revenue due to the transformer damage. The BI calculation factored in during the period of interruption the average power generated, the actual sales rate, the planned maintenance downtime and the availability of the WTG’s. Matter settled following negotiations.

800MW Offshore Wind Farm – Europe

Appointed delay and quantum experts in a matter relating an offshore windfarm project. The £1bn project scope consisted of offshore HVDC converter station, onshore substation and connector and land cabling. Kenzie represented the defendant (the EPC contractor) in an arbitration pursued by the offshore platform fabricator. We were instructed to prepare a delay counter claim and evaluate variations. Testimony given to the international arbitration tribunal on four separate occasions.

916MW Offshore Wind Farm – Europe 

Appointed delay and quantum experts in a matter relating an offshore windfarm project. The £1bn project scope consisted of offshore HVDC converter station, onshore substation and connector and land cabling. Kenzie represented the claimant (the EPC contractor) in a litigation against the client. Instructed to prepare a prolongation and disruption claim in excess of £100 million.

350MW Offshore Wind Farm – Europe 

Appointed delay and quantum experts in a matter relating an offshore windfarm project. The £50M project scope consisted of offshore HVDC converter station equipment and onshore substation. Kenzie represented the claimant (the EPC contractor) in a litigation against the client. Instructed to prepare a prolongation and disruption claim in excess of £25 million. Matter settled following negotiations.

440MW Offshore Wind Farm – UK 

Appointed delay experts in a matter relating an offshore windfarm project. The claim concerned damage to the connector cabling. Kenzie analysed the submitted Contingent Delay in Start Up (DSU) claim and independently calculated the period of interruption caused by the indemnified event. The matter settled following negotiation.